盐城夜总会-盐城夜总会

德阳附近有没有服务

 
Home page Company profile news information Product display Technology Center Qualification certificate Sales network Engineering performance contact us
 please wait a moment...
Project list
       Pool anticorrosion
       Anti corrosion of sewage tank
       Anti corrosion of cement tank
       San Bu Wu you
       Three oil two cloth
       Three cloth four oil
       Three cloth and four coating
       FRP anticorrosion
       Two cloths and three oils
       FRP anticorrosion of water tank
       Anticorrosion of FRP chimney
       Anti corrosion of epoxy FRP
       Anti corrosion of glass fiber reinforced plastic lining
       Anticorrosion of FRP pool wall
 
contact us

Name: Jiangsu Xinda high altitude Engineering Co., Ltd
Address: South of Dongjin Middle Road, Yancheng City, Jiangsu Province
Contact person: Wang Weiyin (General Manager)
Mobile phone: 19962399555
    19962377555
Tel: 0515-88725999
Website address: ginajacobi.com

 
Enterprise trends
 

Anti corrosion of sewage pool and treatment of cracks in anti-corrosion structure of water tank

Hits: 379 2020-01-05 14:09:04 source: Pool anticorrosion_ Anti corrosion of sewage tank_ Anti corrosion of cement tank_ FRP anticorrosion of water tank_ Jiangsu Xinda high altitude Engineering Co., Ltd

Anti corrosion of sewage tank |Treatment method for cracks in anti-corrosion structure of water tank
Pool anticorrosion The structural crack treatment method is to treat the pool cracks according to the temperature deformation joint, that is, the original steel bar protective layer is removed within the range of 400mm on the left and right sides of the crack, the crack is exposed by washing with clean water, and the 30mm wide gap is removed with steel drill rod, and the deformation joint is treated according to the method of post buried rubber waterstop.
When embedding the waterstop, attention should be paid to:
a) The concrete should be removed by using the quick drill rod to reduce the vibration as far as possible, so as not to make the adjacent concrete structure loose;
b) After the gap of 30n1n1 in the middle is cleared, it shall be filled tightly with asphalt hemp thread, and attention shall be paid not to pollute the roughened concrete surface;
c) Wash the rough surface with clean water, and keep the concrete moist for more than 48h;
d) Use waterproof mortar to level the rough surface of concrete, use iron trowel to roll and smooth, and then use wood trowel to rub out fine rough surface, and maintain for more than 48 h;
e) The two planes of the rubber waterstop shall be turned into rough surface with steel file. When paving, a layer of plain cement slurry shall be scraped on the plastered waterproof layer, and then a layer of plain cement slurry shall be scraped on the water stop. The waterstop is extruded and paved from bottom to top and from middle to both sides. And the wooden top brace was used for temporary fixation. Then, a layer of plain cement slurry is scraped outside the waterstop, and the external additional concrete covering layer of the same type as the original pool wall is poured by formwork. For the convenience of pouring and tamping, the formwork can be supported in sections, and the deformation joint that has been picked out in the middle shall be connected with the external additional layer. The deformation joint of the external additional layer can be fixed by sawn asphalt plate at one time during formwork erection. Website: ginajacobi.com
Copyright: Jiangsu Xinda high altitude Engineering Co., Ltd. copyright notice address: south side of Dongjin Middle Road, Yancheng City, Jiangsu Province
Contact: Wang Weiyin (General Manager) Tel: 0515-88725999 Mobile: (0) 19962399555 19962377555 website optimization QQ: 97595105
Key words of the website: [anti-corrosion of water pool] [anti-corrosion of sewage pool] [anticorrosion of cement pool] [FRP anticorrosion of pool] [three cloth and five oil] [three oil and two cloth] [anticorrosion of FRP chimney]