云南妹妹上门-云南妹妹上门

德阳附近有没有服务

 
Home page Company profile news information Product display Technology Center Qualification certificate Sales network Project performance contact us
 please wait a moment...
Project list
       Pool anticorrosion
       Anti corrosion of sewage tank
       Anti corrosion of cement tank
       San Bu Wu you
       Three oil two cloth
       Three cloth four oil
       Three cloth and four coating
       FRP anticorrosion
       Two cloths and three oils
       FRP anticorrosion of water tank
       Anticorrosion of FRP chimney
       Anti corrosion of epoxy FRP
       Anti corrosion of glass fiber reinforced plastic lining
       Anticorrosion of FRP pool wall
 
contact us

Jiangsu high altitude Engineering Co., Ltd
Address: South of Dongjin Middle Road, Yancheng City, Jiangsu Province
Contact person: Wang Weiyin (General Manager)
Mobile phone: 19962399555
    19962377555
Tel: 0515-88725999
Www.ffgs

 
Industry news
 

Leakage stoppage of sewage tank, waterproof and leakage stoppage of sewage pool in sewage treatment plant, and matters needing attention during operation of sedimentation tank

Hits: 276 2020-01-17 20:57:20 source: Pool anticorrosion_ Anti corrosion of sewage tank_ Anti corrosion of cement tank_ FRP anticorrosion of water tank_ Jiangsu Xinda high altitude Engineering Co., Ltd

Leakage stoppage of sewage tank, waterproof and leakage stoppage of sewage pool in sewage treatment plant, and matters needing attention during operation of sedimentation tank
1. Check whether the mud scraper and other metal parts are missing, whether the corrosion protection is in good condition, and whether it operates well when the sewage pool is full of water.
2. After the sedimentation tank starts to water in, observe whether the tank wall and settlement joint are leaking, do well in the settlement observation, and check whether there is uneven sedimentation in the sedimentation tank. By observing whether the water outlet at the triangular weir is uniform, the sedimentation of the sedimentation tank can also be found. Waterproof and plugging of chemical pool.
3. For the loaded operation of sludge scraper or suction scraper in the sewage tank, mainly observe whether the vibration, noise and the operation of the driving motor are normal, and whether the linear speed and angular speed are within the set range. The sewage pool is waterproof and leakproof.
4. Test and determine whether the scraping and suction functions and slag scraping functions of the mud scraper or suction scraper are normal, observe whether the scum on the surface of the sedimentation tank can be discharged in time, and observe the suction and scraping effect when the sludge discharge volume changes within a certain range. The pool is waterproof and leakproof.
5. The inlet and outlet conditions are measured respectively to verify whether the sedimentation tank meets the design requirements under the design inflow load. The sewage pool is waterproof and leakproof.
6. Check whether the automatic control system related to the sedimentation tank can be normally linked, such as the automatic start-up and stop function of the primary sedimentation tank and the automatic discharge of excess sludge or scum in the secondary sedimentation tank according to the mud level meter. Waterproof and plugging of chemical pool.
Website: ginajacobi.com
Copyright: Jiangsu Xinda high altitude Engineering Co., Ltd. copyright notice address: south side of Dongjin Middle Road, Yancheng City, Jiangsu Province
Contact: Wang Weiyin (General Manager) Tel: 0515-88725999 Mobile: (0) 19962399555 19962377555 website optimization QQ: 97595105
Key words of the website: [anti-corrosion of water pool] [anti-corrosion of sewage pool] [anticorrosion of cement pool] [FRP anticorrosion of pool] [three cloth and five oil] [three oil and two cloth] [anticorrosion of FRP chimney]