天津市兼职女qq-天津市兼职女qq

德阳附近有没有服务

 
Home page website Company profile news information Product display Technology Center Qualification certificate Sales network Project performance contact us
 please wait a moment...
Project list
       Anti corrosion water tank
       Anti corrosion of sewage tank
       Anti corrosion of cement tank
       San Bu Wu you
       Three oil two cloth
       Three cloth four oil
       Three cloth and four coating
       FRP anticorrosion
       Two cloths and three oils
       FRP anticorrosion of water tank
       Anticorrosion of FRP chimney
       Anti corrosion of epoxy FRP
       FRP lining
       Anticorrosion of FRP pool wall
 
contact us

Name: Jiangsu Xinda high altitude Engineering Co., Ltd
East side of Yancheng Road, Jiangsu Province
Contact person: Wang Weiyin (General Manager)
Mobile phone: 19962399555
    19962377555
Tel: 0515-88725999
Website address: ginajacobi.com

 
Technology Center
 
The first coat of primer should be sprayed when there is residual temperature in the zinc layer. Before spraying, the welding slag, flying oil and other attachments should be carefully removed, and the oil stain on the base surface should be cleaned. The quality assessment of surface spraying should be done carefully and the quality records should be filled in. The first layer of coating should be slightly diluted before spraying, so as to facilitate the penetration of the coating into the pores of the coating and enhance its adhesion. The sealing coating shall meet the requirements of construction drawings and technical documents. The coating method of sealing layer shall be selected according to the physical properties, construction conditions and the shape of beitu structure. It can also be carried out according to the requirements of the coating manufacturer. The coating interval shall be implemented according to the regulations of the coating manufacturer. If the allowable interval time is exceeded, the previous coating shall be roughened with coarse sand cloth before coating to ensure the adhesion between coatings. The coating surface is uniform. After the film is cured and dried, the dry film thickness is measured. The measurement results show that the thickness of more than 85% of the measuring points reaches the design thickness, and the thickness of the measuring point not reaching the design thickness is not less than 85% of the design thickness. After the film is cured and dried, the adhesion shall be checked according to the relevant provisions of sl105-95, and no peeling phenomenon is allowed. There are three indicators for the quality inspection of paint brushing: appearance, thickness and adhesion. The appearance of the coating should be uniform and smooth, without impurities, sagging, peeling, wrinkles, blisters, coarse particles and cracks. Thickness the accumulated thickness of zinc layer and paint layer can be measured directly by digital display thickness gauge. Adhesion was checked by cutting test. Company website: www.ffgs
Copyright: Jiangsu Xinda high altitude Engineering Co., Ltd. copyright notice address: south side of Dongjin Middle Road, Yancheng City, Jiangsu Province
Contact: Wang Weiyin (General Manager) Tel: 0515-88725999 Mobile: (0) 19962399555 19962377555 website optimization QQ: 97595105
Key words of the website: [anti-corrosion of water pool] [anti-corrosion of sewage pool] [anticorrosion of cement pool] [FRP anticorrosion of pool] [three cloth and five oil] [three oil and two cloth] [anticorrosion of FRP chimney]